The Floating and Towing...
 
Submarine Dry Dock

In 1992 the Dry Dock was complete and site was flooded. Shortly after this the sea wall was broken away and the structure was floated out into the River Clyde where it was towed to its new home at RNAD Coulport at Loch Long.
Click on an image to enlarge and see full set of 7 images